Almora News: Metalling of Kafada-Tipola Road Completed After Two Decades.”

Dwarahat (Almora): After a wait of 22 long years, the metalling of the Kafada-Tipola road, connecting more than 15 villages, has finally been completed. This has provided convenience to the population of over six thousand in these villages. The rural residents celebrated with joy as soon as the project was completed.”

Back to top button