Power supply and road systems disrupted by rain to be restored soon, CM Yogi directs prompt action

Chief Minister Yogi Adityanath has directed officials to take prompt action to restore electricity and road systems affected by heavy rain in various parts of the state at the earliest. CM has emphasized early repair of electricity poles and wires damaged by the rain and prompt restoration of power supply in the affected areas. He clearly directed that people should not face a prolonged power crisis due to the rain and that repair work should be expedited.

Chief Minister directed officials of the Electricity Department to inspect affected areas, assess the condition of damaged electrical infrastructure, and immediately undertake repair work as required. They have also been instructed to repair electricity poles, wires and other equipment and restore the power supply system at the earliest. CM directed that teams remain active at the local level and resolve complaints promptly.

Chief Minister has also directed immediate repair of roads damaged by heavy rain. Roads damaged by waterlogging and rain are to be identified, and necessary repair work completed at the earliest to avoid hindering people’s movement. CM directed officials to work in coordination to restore essential public services such as electricity and roads to normal at the earliest. Emphasizing that relief efforts and service restoration in affected areas should not be delayed, CM directed concerned officials to set priorities based on local conditions and ensure relief reaches affected people as soon as possible.

Damaged electricity poles and wires caused by heavy rain must be repaired immediately: CM

Emphasis on restoring power supply in affected areas and providing relief to people

CM stresses repair of damaged roads to ensure smooth movement

Back to top button