By 2027-28, Tamil Nadu peak power demand may be 23,000 MW

New network expansion schemes and mitigation measures to address the issues in the Southern Region are being taken up on a continuous basis and would be taken up in the subsequent rolling plan after a detailed analysis
Back to top button