
A proposed corridor of 72.2 kilometers for the Rapid Rail includes 12 stations. The operation of both the Rapid Rail and the Metro is envisioned for this corridor. The Rapid Rail will converge with the Aqua Line at Pari Chowk. The construction will be carried out in two phases, with the first phase completing a 37.15-kilometer corridor from Ghaziabad to Ecotech Five by 2031