RRTS: Integrated trials in final stage on 17km section in Ghaziabad

The 82km RRTS project is being developed by NCR transport corporation (NCRTC) at a cost of ₹30,274 crore. The project connects three cities of Delhi, Ghaziabad and Meerut with the help of high-speed trains
Back to top button